Thursday, March 15, 2012

Casting the Lead Part1

Having finished welding the tank interior....


It is time to start placing the ballast.
We have 5500 kg of lead to cast.
So we got organized










Wednesday, March 14, 2012

The Mast

While working at the boat I have ordered the mast to a local shop, Tibermast. being in Rome the name is appropiate.


This is "Picchio" Matteucci!







Tuesday, March 13, 2012

The Bow: part 2


We started preparing the mooring bollards.
They are made by 50x5 pipe, 30 cm long. The base will be through the deck achored to the frames.



A small hole for drainage of water condensation. Into the watertight compartment.


The bow is now finished with the anchor roller, forestay and code-0 chainplates



Some thinking ahead: the liferaft a Zodiac 6p. Really big case. I do not know where to find a safe place for it.





Friday, February 24, 2012

Planning the Interior

While doing some finishing work that will not be possible after installation



I started some interio planning.
The first step was to recreate the two floor levels in the deck saloon.


This is where the dinette will go



And here is the space the galley. I decided to move the galley to the DS for two reasons.
First this is the place that we shall live more. So moving up and down stairs is not convenient.
Furthermore any activity, during navigation, without outside view is not pleasant.
Second the space of the galley will be given to the master cabin



Cockpit seat finished.

Thursday, February 23, 2012

The Bow


The mast step is now welded in place



This is a proposal of modification of the original project.



And this is a major one.
As I have decided that the boat will be a true cutter, yankee and solent, and no >100% genoa, I will need a code-0 for light winds, up to 10-15knts.
The type of bowsprit that you need for this type of sail requires much, much greater strength than a retractable gear.
The second consideration was housing the Rocna33.

So this is a draft of what I will build