Framing goes on

Web frames are placed on the lofting floor for accurate alignment and blocked together.

Then side A is welded on the floor.



A reinforcement bar is placed horizontally on every frame at the level of the DWL.


Run in run off is used at every BW.

Side B welding is done on a table for sake of back well being


So frames start to pile up quickly


One More!

Good work we have almost finished stem ONE: welding web frames