Placing the frames at the exact interval and obtaining a perfect alignment was not difficult but required a lot of care.
Checking the distance between frames and from BH B. Then we blocked the frame supports to the strongback with bolts.
But at the end the measurements where within millimetric tolerance
Now it is time fro the centerline
This is a boat!
No comments:
Post a Comment