Tuesday, March 13, 2012

The Bow: part 2


We started preparing the mooring bollards.
They are made by 50x5 pipe, 30 cm long. The base will be through the deck achored to the frames.



A small hole for drainage of water condensation. Into the watertight compartment.


The bow is now finished with the anchor roller, forestay and code-0 chainplates



Some thinking ahead: the liferaft a Zodiac 6p. Really big case. I do not know where to find a safe place for it.





No comments:

Post a Comment