We did a little test on how to polish the external welds
Then we placed the last piece of sheer tube (50x5) that was missing
Friday, December 23, 2011
Thursday, December 15, 2011
Bottom Plates Distortion
After completing the outside weld the was a distortion due to plate elongation.
We tried co adjust it by placing 1500 kg of lead.
Pushing from inside
But finally we decided to cut to release the tension and weld again
It worked pefectly!
We tried co adjust it by placing 1500 kg of lead.
Pushing from inside
But finally we decided to cut to release the tension and weld again
It worked pefectly!
Saturday, December 10, 2011
Salon Nautic Paris 2011
A visit to Paris before Christmas is always pleasant. A nice plateau of oysters with a good Sancerre!
The nautic expo is a good excuse. By the way it is the only place in Europe where you can see aluminium boats from Allure and Alubat.
Allure has acquired Garcia. They are making this strange combination of aluminium hull with plastic deck and interior. The tecnique reduces costs and allows to create a deck with a look more attractive to modern sailors.
But I would never trust this rail!
I am now looking more at construction details than at appearance. Forepeak of the 45". Clean a little bit "light" construction.
Nice mast support.
Good finish
Also the 445 Ovni has some interesting ideas
The air conduct for the engine
The rollbar with the tender lift copied from Jean Pierre Brouns idea on the GT40
A solution for the anchor
But wood is still wood!
The nautic expo is a good excuse. By the way it is the only place in Europe where you can see aluminium boats from Allure and Alubat.
Allure has acquired Garcia. They are making this strange combination of aluminium hull with plastic deck and interior. The tecnique reduces costs and allows to create a deck with a look more attractive to modern sailors.
But I would never trust this rail!
I am now looking more at construction details than at appearance. Forepeak of the 45". Clean a little bit "light" construction.
Nice mast support.
Good finish
Also the 445 Ovni has some interesting ideas
The air conduct for the engine
The rollbar with the tender lift copied from Jean Pierre Brouns idea on the GT40
A solution for the anchor
But wood is still wood!
Friday, December 9, 2011
Friday, December 2, 2011
Removing the Strongbacks
The internal seam have been welded. The effect of the strongbacks was very positive. The retraction on the weld pulled the strongbacks toward the inside and as a matter of fact generated a compound curvature in the longitudinal direction.
The welding of the outside will complete the work
Meanwhile we positioned the forepeak deck
Wednesday, November 30, 2011
Wednesday, November 23, 2011
Welding the seams: INSIDE
Before stating to weld we positioned an aspiration device
Then we started welding. I had a lot of thinking on where to start, transversal or longitudinal.
On Robert instructions it said transversal according to Kasten paper on metal boat builing.
But Kasten in his paper says longitudinal first. The topside plates against the radius seams have already a perfect fit and they do not need to bend. If we weld the transversal first they might move and it would be difficult to bring them back in position. And they are in the final position now.
So longitudinal first and let's hope for the best!
Then the transversal radius
And when possible bilateral!
Then we started welding. I had a lot of thinking on where to start, transversal or longitudinal.
On Robert instructions it said transversal according to Kasten paper on metal boat builing.
But Kasten in his paper says longitudinal first. The topside plates against the radius seams have already a perfect fit and they do not need to bend. If we weld the transversal first they might move and it would be difficult to bring them back in position. And they are in the final position now.
So longitudinal first and let's hope for the best!
Then the transversal radius
And when possible bilateral!
Subscribe to:
Posts (Atom)



























